精英家教網 > 高中英語 > 題目詳情

The man showed us so heavy a stone ________ no man can lift.


  1. A.
    that
  2. B.
    as
  3. C.
    which
  4. D.
    and
B
當先行詞前有so時,用as引導定語從句,as在從句中作主語或賓語。假若在lift后加上it,答案就是that了,請想想這是為什么。
練習冊系列答案
相關習題

科目:高中英語 來源: 題型:閱讀理解

A few years ago, Paul Gerner began to gather a group of architects in Las Vegas to ask them what it would take to design a public school that used 50 percent less energy, cost much less to build and obviously improved student learning. “I think half of them fell off their chairs,” Gerner says.

Gerner manages school facilities (設施) for Clark County, Nevada, a district roughly the size of Massachusetts. By 2018, 143,000 additional students will enter the already crowded public-education system. Gerner needs 73 new schools to house them. Four architecture teams have nearly finished designing primary school prototypes (樣品); they plan to construct their schools starting in 2009. The district will then assess how well the schools perform, and three winners will copy those designs in 50 to 70 new buildings.

Green schools are appearing all over, but in Clark County, which stands out for its vastness, such aggressive targets are difficult because design requirements like more natural light for students go against the realities of a desert climate. “One of the biggest challenges is getting the right site orientation (朝向),”Mark McGinty, a director at SH Architecture, says. His firm recently completed a high school in Las Vegas. “You have the same building, same set of windows, but if its orientation is incorrect and it faces the sun, it will be really expensive to cool.”

Surprisingly, the man responsible for one of the most progressive green-design competitions has doubts about ideas of eco-friendly buildings. “I don’t believe in the new green religion,” Gerner says. “Some of the building technologies that you get are impractical. I’m interested in those that work.” But he wouldn’t mind if some green features inspire students. He says he hopes to set up green energy systems that allow them to learn about the process of harvesting wind and solar power. “You never know what’s going to start the interest of a child to study math and science,” he says.

How did the architects react to Gerner’s design requirements?

A. They lost balance in excitement.                B. They showed strong disbelief.

C. They expressed little interest.                     D. They burst into cheers.

Which order of steps is followed in carrying out the project?

A. Assessment — Prototype — Design — Construction.

B. Assessment — Design — Prototype — Construction.

C. Design — Assessment — Prototype — Construction.

D. Design — Prototype — Assessment — Construction.

What makes it difficult to build green schools in Clark County?

A. The large size.                                          B. Limited facilities.

C. The desert climate.                                    D. Poor natural resources.

What does Gerner think of the ideas of green schools?

A. They are questionable.                               B. They are out of date.

C. They are advanced.                                    D. They are practical.

查看答案和解析>>

科目:高中英語 來源: 題型:閱讀理解

A few years ago, Paul Gerner began to gather a group of architects in Las Vegas to ask them what it would take to design a public school that used 50 percent less energy, cost much less to build and obviously improved student learning. “I think half of them fell off their chairs,” Gerner says.  

Gerner manages school facilities (設施) for Clark County, Nevada, a district roughly the size of Massachusetts. By 2018, 143,000 additional students will enter the already crowded public-education system. Gerner needs 73 new schools to house them. Four architecture teams have nearly finished designing primary school prototypes (樣品); they plan to construct their schools starting in 2009. The district will then assess how well the schools perform, and three winners will copy those designs in 50 to 70 new buildings.  

Green schools are appearing all over, but in Clark County, which stands out for its vastness, such aggressive targets are difficult because design requirements like more natural light for students go against the realities of a desert climate. “One of the biggest challenges is getting the right site orientation (朝向),” Mark McGinty, a director at SH Architecture, says. His firm recently completed a high school in Las Vegas. “You have the same building, same set of windows, but if its orientation is incorrect and it faces the sun, it will be really expensive to cool.”  

Surprisingly, the man responsible for one of the most progressive green-design competitions has doubts about ideas of eco-friendly buildings. “I don’t believe in the new green religion,” Gerner says. “Some of the building technologies that you get are impractical. I’m interested in those that work.” But he wouldn’t mind if some green features inspire students. He says he hopes to set up green energy systems that allow them to learn about the process of harvesting wind and solar power. “You never know what’s going to start the interest of a child to study math and science,” he says.  

 

63. How did the architects react to Gerner’s design requirements?  

A. They lost balance in excitement.                B. They showed strong disbelief.  

C. They expressed little interest.                     D. They burst into cheers.  

 

64. Which order of steps is followed in carrying out the project?  

A. Assessment ― Prototype ― Design ― Construction.  

B. Assessment ― Design ― Prototype ― Construction.  

C. Design ― Assessment ― Prototype ― Construction.  

D. Design ― Prototype ― Assessment ― Construction.  

 

65. What makes it difficult to build green schools in Clark County?  

A. The large size.                                          B. Limited facilities.  

C. The desert climate.                                    D. Poor natural resources.  

 

66. What does Gerner think of the ideas of green schools?  

A. They are questionable.                               B. They are out of date.  

C. They are advanced.                                   D. They are practical.

查看答案和解析>>

科目:高中英語 來源:湖南省師大附中09-10學年高二下學期階段檢測(英語) 題型:閱讀理解

A few years ago, Paul Gerner began to gather a group of architects in Las Vegas to ask them what it would take to design a public school that used 50 percent less energy, cost much less to build and obviously improved student learning. “I think half of them fell off their chairs,” Gerner says.
Gerner manages school facilities(設施)for Clark County, Nevada, a district roughly the size of Massachusetts. By 2018, 143,000 additional students will enter the already crowded public-education system. Gerner needs 73 new schools to house them. Four architecture teams have nearly finished designing primary school prototypes(樣品); they plan to construct their schools starting in 2009. The district will then assess how well the schools perform, and three winners will copy those designs in 50 to 70 new buildings.
Green schools are appearing all over, but in Clark County, which stands out for its vastness, such aggressive targets are difficult because design requirements like more natural light for students go against the realities of a desert climate. “One of the biggest challenges is getting the right site orientation(朝向),” Mark McGinty, a director at SH Architecture, says. His firm recently completed a high school in Las Vegas. “You have the same building, same set of windows, but if its orientation is incorrect and it faces the sun, it will be really expensive to cool.”
Surprisingly, the man responsible for one of the most progressive green-design competition has doubts about ideas of eco-friendly buildings. “I don’t believe in the new green religion,” Gerner says. “Some of the building technologies that you get are impractical. I’m interested in those that work.” But he wouldn’t mind if some green features inspire students. He says he hopes to set up green energy systems that allow them to learn about the process of harvesting wind and solar power. “You never know what’s going to start the interest of a child to study math and science,” he says.
45. How did the architects react to Gerner’s design requirements?
A. They lost balance in excitement.                  B. They showed strong disbelief.
C. They expressed little interest.                       D. They burst into cheers.
46. Which order of steps is followed in carrying out the project?
A. Assessment — Prototype — Design — Construction.
B. Assessment — Design — Prototype — Construction.
C. Design — Assessment — Prototype — Construction.
D. Design — Prototype — Assessment — Construction.
47. What makes it difficult to build green schools in Clark County?
A. The large size.                                           B. Limited facilities.
C. The desert climate.                                      D. Poor natural resources.
48. What does Gerner think of the ideas of green schools?
A. They are questionable.                                 B. They are out of date.
C. They are advanced.                                      D. They are practical.

查看答案和解析>>

科目:高中英語 來源:2009年普通高等學校招生全國統(tǒng)一考試湖北卷英語試題 題型:閱讀理解

A few years ago, Paul Gerner began to gather a group of architects in Las Vegas to ask them what it would take to design a public school that used 50 percent less energy, cost much less to build and obviously improved student learning. “I think half of them fell off their chairs,” Gerner says.
Gerner manages school facilities (設施) for Clark County, Nevada, a district roughly the size of Massachusetts. By 2018, 143,000 additional students will enter the already crowded public-education system. Gerner needs 73 new schools to house them. Four architecture teams have nearly finished designing primary school prototypes (樣品); they plan to construct their schools starting in 2009. The district will then assess how well the schools perform, and three winners will copy those designs in 50 to 70 new buildings.
Green schools are appearing all over, but in Clark County, which stands out for its vastness, such aggressive targets are difficult because design requirements like more natural light for students go against the realities of a desert climate. “One of the biggest challenges is getting the right site orientation (朝向),”Mark McGinty, a director at SH Architecture, says. His firm recently completed a high school in Las Vegas. “You have the same building, same set of windows, but if its orientation is incorrect and it faces the sun, it will be really expensive to cool.”
Surprisingly, the man responsible for one of the most progressive green-design competitions has doubts about ideas of eco-friendly buildings. “I don’t believe in the new green religion,” Gerner says. “Some of the building technologies that you get are impractical. I’m interested in those that work.” But he wouldn’t mind if some green features inspire students. He says he hopes to set up green energy systems that allow them to learn about the process of harvesting wind and solar power. “You never know what’s going to start the interest of a child to study math and science,” he says.
【小題1】How did the architects react to Gerner’s design requirements?

A.They lost balance in excitement.B.They showed strong disbelief.
C.They expressed little interest.D.They burst into cheers.
【小題2】Which order of steps is followed in carrying out the project?
A.Assessment — Prototype — Design — Construction.
B.Assessment — Design — Prototype — Construction.
C.Design — Assessment — Prototype — Construction.
D.Design — Prototype — Assessment — Construction.
【小題3】What makes it difficult to build green schools in Clark County?
A.The large size.B.Limited facilities.
C.The desert climate.D.Poor natural resources.
【小題4】What does Gerner think of the ideas of green schools?
A.They are questionable.B.They are out of date.
C.They are advanced.D.They are practical.

查看答案和解析>>

科目:高中英語 來源:2009年高考試題(湖北卷)解析版 題型:閱讀理解

 

A few years ago, Paul Gerner began to gather a group of architects in Las Vegas to ask them what it would take to design a public school that used 50 percent less energy, cost much less to build and obviously improved student learning. “I think half of them fell off their chairs,” Gerner says.

Gerner manages school facilities (設施) for Clark County, Nevada, a district roughly the size of Massachusetts. By 2018, 143,000 additional students will enter the already crowded public-education system. Gerner needs 73 new schools to house them. Four architecture teams have nearly finished designing primary school prototypes (樣品); they plan to construct their schools starting in 2009. The district will then assess how well the schools perform, and three winners will copy those designs in 50 to 70 new buildings.

Green schools are appearing all over, but in Clark County, which stands out for its vastness, such aggressive targets are difficult because design requirements like more natural light for students go against the realities of a desert climate. “One of the biggest challenges is getting the right site orientation (朝向),” Mark McGinty, a director at SH Architecture, says. His firm recently completed a high school in Las Vegas. “You have the same building, same set of windows, but if its orientation is incorrect and it faces the sun, it will be really expensive to cool.”

Surprisingly, the man responsible for one of the most progressive green-design competitions has doubts about ideas of eco-friendly buildings. “I don’t believe in the new green religion,” Gerner says. “Some of the building technologies that you get are impractical. I’m interested in those that work.” But he wouldn’t mind if some green features inspire students. He says he hopes to set up green energy systems that allow them to learn about the process of harvesting wind and solar power. “You never know what’s going to start the interest of a child to study math and science,” he says.

1.How did the architects react to Gerner’s design requirements?

A. They lost balance in excitement.             B. They showed strong disbelief.

C. They expressed little interest.              D. They burst into cheers.

2.Which order of steps is followed in carrying out the project?

A. Assessment — Prototype — Design — Construction.

B. Assessment — Design — Prototype — Construction.

C. Design — Assessment — Prototype — Construction.

D. Design — Prototype — Assessment — Construction.

3.What makes it difficult to build green schools in Clark County?

A. The large size.                          B. Limited facilities.

C. The desert climate.                      D. Poor natural resources.

4.What does Gerner think of the ideas of green schools?

A. They are questionable.                   B. They are out of date.

C. They are advanced.                       D. They are practical.

 

查看答案和解析>>

同步練習冊答案